mn 511 road conditions


Resurface two miles of Hwy 23 from 5th Street to Hwy 39. Install cable median barrier between County Road C and 1-694 and extend left turn lanes at Lydia Avenue W County Road C2 and County Road C. Study to identify a recommended alternative. 11. Reconstruct and improve pedestrian access from Second Avenue South to Second Avenue North in Meire Grove, Stearns County. Future road construction plans for I-94 in Wright and Stearns counties, in central Minnesota. If you are local to the area in which you need weather information, we encourage you to leave your own Minnesota weather report or traffic update to help other visitors. New left turn lanes along Highway 37 at both intersections. Construct or repair a noise wall and install landscaping between Prior Avenue and Fairview Avenue, Update pedestrian ramps at various locations to meet current accessibility standards from Cretin Avenue/Vandalia Street to Western Avenue and Fairview Avenue, Install landscaping from Pascal Street to Mackubin Street, Improve accessibility, and signals along the frontage road from Cretin Avenue to Griggs Street. KARE11.com interactive traffic map will help you check current traffic conditions for Minneapolis St. Paul With input from the city of Lake Crystal, local residents and businesses, and other project stakeholders, MnDOT will evaluate the corridor, develop design alternatives, and arrive at a preliminary layout for a future Hwy 60 roadway project. New turn lane and median removal at Hwy 53 intersections at Miller Trunk Road and at Bodas Road / East Long Lake Road. - 6p.m.) Reconstruct Hwy 25 from south of First Street South to north of Settlers Parkway Buffalo, Wright County, includes city utilities and pedestrian sidewalks and approaches. Provides up to the minute traffic and transit information for New York. Snow/Slush. 14 and Hwy 115. A Reduced Conflict Intersection (RCI) is scheduled to be constructed on Hwy 2 at the intersection with Hwy 32 near Marcoux Corner. Identify options for access changes, improvements to safety and mobility, Resurface nine miles of Hwy 169 from Faribault County Road 52 (southern limits of Blue Earth) to the northern limits of Elmore. Resurfacing of Hwy 71 from Viking Drive to the intersection of Hwy 212 in Olivia. Normal traffic speeds WILL be impacted due to reduced visibility, The roadway has deteriorated and/or visibility has been reduced to the point that it is very dangerous to travel, There are reports of intermittent white out conditions, Some weather conditions can be severe enough that road treatments, such as salt or sand, are not effective, Emergency vehicles and snow removal equipment may be called off the roadway due to the conditions, In the event of an emergency, it may be impossible to get emergency vehicles to the scene. Evaluate the Hwy 77/Cedar Avenue corridor from 138th St. in Apple Valley to I-494 in Richfield. Simply download the 511 app on either your Apple or Android device or call 511 from your cell or landline phone. Reconstruct and improve Hwy 27 between I-94 in Douglas County and Hwy 71 in Todd County. Resurface ramps and frontage roads, bridge repair, fix drainage and repair various sidewalks and ADA improvements, Install landscaping between University Avenue and Wheelock Parkway, Reconstruct I-35W bridge over the Minnesota River, replace pavement, add northbound lane. Since the study was completed, Hwy 371 has been expanded to four lanes between Nisswa and Jenkins. Construction dates: September 2020 through November 2021, Traffic impacts: Lane closures, access changes or closures and truck detour, Construction: February through August 2021, Construction dates: July to October 2020, and May to October 2021, Traffic impacts: Lane closures, local detours, Construction: July through September 2021, Road Safety Audit: October 2020 through summer 2021, Scheduled for construction on July 19, 2021, Construction dates: December 2019 to 2021, Construction dates: July 2020 to fall 2021, Traffic impacts: Lane closures, local detour, Construction dates: April through August 2021. Study completed 2007; project is unprogrammed; no funds are available, Construction dates: July 2017 through late fall 2021, Traffic impacts: Lane closures or possible full closures, Study dates: Summer 2020 through summer 2022, Construction dates: July 2020 through October 2021, Traffic impacts: Lane closures, possible detour, Construction dates: Spring 2020 through June 2021, Traffic impacts: Possible shoulder closures, Study completed 2003; no projects have been funded or planned, Study completed in 2015; no projects have been funded or planned, Preliminary design in progress; scheduled for construction in 2022-2024, Study completed 2013; no projects have been funded or planned, Tree clearing: December 2020 through January 2021, Plans in progress; scheduled for construction in 2022, Community Review Panel study (looking for preferred alternative in spring 2021), Study 2019-2021; plan 2022-2024; scheduled for construction in 2025 or beyond, Impacts: Detour, lane closures, truck route, Plans in progress; projects scheduled for construction 2022 and 2024, Impacts: Weekday detour, lane closures on westbound, Traffic impacts: Possible lane and road closures, Community outreach, information gathering and project development, Study underway; scheduled for construction in 2022-2024, Construction dates: August 2019 to October 2021, Traffic impacts: Closure of ramps from southbound I-35W to westbound I-494 and from eastbound I-494 to southbound I-35W, Study in progress; no projects have been funded or planned, Construction: August 2021 through November 2023, Study completed; no projects have been funded or planned, Construction: March 15 through mid-June 2021, Construction: August 2020 through May 2021, Construction: September 2020 through June 2021, Construction: June 2021 through June 2024, Traffic impacts: Possible lane, shoulder and ramp closures with possible detours, Study dates: April 2020 through spring 2021. Scattered Wet. Update and repair pavement, add trail and redeck or repair bridges in the project area. Safety and accessibility improvements are needed on Hwy 5 and Hwy 61 from I-94 to Roselawn Ave. in St. Paul. Repaving road, flood mitigation and ADA work, Reconstruction of Hwy 67 from Hwy 59 to Sixth Street, The road will remain closed through 2020 due to slide area, Shoulder widening and culvert replacement. View Entire State Northwest Northeast Southwest Southeast Cities. Selective tree logging in right of way, resurface (reclaim), culvert replacements, and bridge replacement at Shell River, Install cable median barrier from the I-35/35E/35W split to Hwy 97, Replace lighting between Diffley Road and Lone Oak Road. Study the freeway between Park Avenue in Minneapolis and County Road C in Roseville to identify needs for future construction projects. I-94 Minnesota real time traffic, road conditions, Minnesota constructions, current driving time, current average speed and Minnesota accident reports. Personalize your route. Replacing two bridges, repaving, adding trail, erosion and drainage repair. Resurfacing of Hwy 12 from Pennock to the bridge 1 mile east of Country Road 5 in Willmar. The project partners will address the purpose and need for the project in the EIS document and develop transportation alternatives. Develop preliminary concept designs for intersection improvements at Century Avenue and Hadley Avenue. The City of Fosston is conducting a corridor study to evaluate the transportation and pedestrian needs of Highway 2 in Fosston.Â. 511 statewide traveler map - Full-featured option provides access to traffic-related construction reports, weather events, traffic speed information, and static traffic camera reports Threat Forecast Current Road Conditions. Get real-time road and traffic reports on all metro interstates and highways. Grade and resurface Hwy 2 East of Cass Lake to Cass County road 10. View the real time traffic map with travel times, traffic accident details, traffic cameras and other road conditions. Information about how to use this site can be found here. ; Traffic Reconstruct both directions of Hwy 10 from Xenia Ave. to Lowell Ave. in Elk River, includes sidewalks, multi-use trail and signal systems. and in the afternoon (3p.m. Resurfacing over 8 miles of Hwy 14 from the west side of the Sanborn Four Corners intersection to the eastern city limits of Springfield. MnDOT is committed to protecting the health, safety and well-being of its employees, contractors and all Minnesotans. Impacts: All lanes will remain open during construction with lane restrictions on nights or weekends. The work will include pavement work, drainage updates, right turn lanes, safety and pedestrian improvements. Map Views . Call 511 or visit 511.org to get information about Traffic, Transit, Carpool, Vanpool, or Bicycling. Reconstruct one mile of road in Foley, includes: storm sewer, pedestrian sidewalk/multi-use trail and new roundabout. Additional funding being sought to reconstruct Ferry Street (Hwy 47/Hwy 169) interchange and build auxiliary lanes from Ferry Street to Seventh Avenue. Dry or wet pavement. Plan your trip and get the fastest route taking into account current traffic conditions. Developing a preliminary design. 511 Traveler Service; Know Your Route; News Releases; Careers/Jobs; Doing Business; ADA and Accessibility; Disclaimer and Legal; About MnDOT; State of Minnesota; Governor's Site; 2021 Minnesota Department of Transportation 395 John Ireland Blvd, St. Paul, MN 55155-1800 651-296-3000 Toll-free 800-657-3774 Hwy 77 will be resurfaced, improve drainage, improve accessibility and center media barrier added. Eastbound will be reduced to one lane of traffic. Repair concrete road surface on Hwy 62 from the west end of the Mendota Bridge to Hwy 5. Complete a safety study of the intersection of Hwy 23 and Hwy 7 in Clara City. The second phase, anticipated in 2021, will produce and screen alternatives. Call 511 or refer to your state Department of Transportation Office Website. Construct a new wood plank and concrete post noise barrier on eastbound I-94 between Fairview Avenue and Prior Avenue in St. Paul. On Hwy 61 from Keller Lake to County Road 65 in White Bear Lake. Two grade separations of Hwy 10/75 under the BNSF rail lines, paving, pedestrian accessibility improvements, utility replacements and signals. Minnesota Department of Transportation: Get Mobile Version: ... Duluth, MN 5027 Miller Trunk Highway Duluth, MN 55811-1442 218-729-6697 - Duluth; 218-283-4615 - Intl Falls Comments? Replace the signal and update accessibility to meet current standards at Coon Rapids Boulevard, Determine safety and mobility needs for bicyclists and pedestrians for the area, Repair noise wall along the south side of I-694 between Silver Lake Road and Long Lake Road, Install lighting from Hwy 61 in Vadnais Heights/White Bear Lake to County Road 10 in Oakdale. A project is planned in 2023 to improve the pavement condition, intersection safety, and mobility along the Hwy 169 corridor on the south side of St. Peter, including the intersections with Hwy 22 and Hwy 99. PLEASE NOTE:Road conditions are updated Monday - Friday in the morning (3a.m. Hwy 169 mobility and transit improvements between Hwy 55 in Golden Valley and Hwy 41 in Shakopee, and between Mankato and the Twin Cities Metro area. Wet. Resurface and reconstruct road between Hwy 19 in Cedar Lake Township to Hwy 282 in Spring Lake Township and add left turn lanes. Resurface fifteen miles of eastbound I-90 between Sherburn and Fairmont. Replace deficient box culvert over unnamed stream in Aitkin County. Resurface, widen shoulders, replace culverts, turn lanes and access improvements, accessibility improvements in Barrett. - 6a.m.) In the meantime, MnDOT engineers are reviewing all available historical crash data to identify patterns, and will be taking short term steps to enhance safety of the intersection. Study to gather public input about this corridor. Construct a Restricted Crossing U-turn (RCUT) at the intersection of Hwy 33 and Gillette Road. Study completed in 2013. in Delano. New road connection from Hwy 23 to Fourth Street in Fond du Lac. Crews will resurface Hwy 55/Hiawatha Ave. between I-35W and Hwy 62, repair bridges from Hwy 55 to 7th St., 8th St. to Hwy 55 and SB Hwy 55 over Franklin Ave. Replace four box culverts along Hwy 210  in Carlton County. The new structure will have pedestrian sidewalks on both sides and shoulders for bicyclists. Planning study to identify future highway improvements that will enhance traffic performance, mobility and driver satisfaction. Regions. Plan your trip and get the fastest route taking into account current traffic conditions. Pavement resurfacing between Moose Lake and Kettle River. US 20 I‑29 US 30 US 34 I‑35 IA 60 I‑74 I‑80 I‑235 I‑380. Resurface, widen shoulders, improve pedestrian accessibility, and drainage repairs. 48 new LED lighting units will also be installed along the corridor to improve lighting and safety. and Cannon Falls in Dakota County. Replace Hwy 71 bridges over the Drayer Creek and Harris Creek in Browerville, Todd County. Repair bridge joints and resurface ramps connecting I-94 and I-394 to downtown Minneapolis. Update concrete and pavement on Hwy 100, and repair bridges and drainage on ramps between I-694 and Hwy 252. Construct a roundabout at Hwy 21 and Sawmill Road/Old Hwy 169 and build trails to connect to existing trails. Road work continues to be a critical service. Safety improvements, construct dedicated turn lanes on Hwy 97, and construct a multi-use trail. The project follows along Hwy 52, from roughly 2 miles south of Cannon Falls and ends at Zumbrota. The pavement on Hwy 169 from Broadway Avenue to Union Street (approximately half of a mile) is deteriorating more quickly than the subsequent sections of Hwy 169.